mpenergi is as far as we know, the only company in Norway that performs and has experience with internal control of pipelines for power stations. Facilities, Safety, experience for this kind of job for pipeles up to 2 km in length, vertical height of 300 meters and dimenson down to Ø800.
The attached photos is from controlling a 1200 meter pipeline, Ø900 and a drop of 245 meters with some parts at a 45% falloff. 99 joints were examined and measured at 4 units per shot.